San Diego, CA: Stormwater Requirements Applicability Checklist, Form DS-560, September 2021

cover image: San Diego, CA: <a href=Stormwater Requirements Applicability Checklist, Form DS-560, September 2021" />

Construction projects are assigned an inspection frequency based on if the project has a “high threat to water quality.” The City has aligned the local definition of “high threat to water quality” to the risk determination approach of the State Construction General Permit (CGP). [. ] Does the project ONLY include retrofitting or redeveloping existing paved alleys, streets or roads designed and constructed in accordance with the Green Streets guidance in the City’s Stormwater Standards Manual? Yes, PDP exempt requirements apply No, proceed to next question PART E – Determine if Project is a Priority Development Project (PDP) Projects that match one of the definitions below are. [. ] The project creates and/or replaces 5,000 square feet Yes No or more of impervious surface (collectively over the project site) and where the development will grade on any natural slope that is twenty-five percent or greater. [. ] “Discharging directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. [. ] The project creates and/or replaces 5,000 square feet or more of impervious surface (collectively over the project site) and where the development will grade on any natural slope that is twenty-five p.

Authors

Pages 4 Published in United States of America